Projects

Julianastraat, Rozenburg

On behalf of Stedin and Evides, we are replacing the low-pressure gas network and the drinking water mains. This project forms part of Stedin’s nationwide replacement programme, under which ageing (brittle) gas pipes will be replaced by 2028.

The works consist of:

  • Replacement of approximately 4.5 km of gas pipeline
  • Replacement of approximately 4.5 km of water mains
  • The refurbishment of approximately 380 gas connections to residential properties

Work began in January 2026 and is expected to continue until the end of 2026.